Bathroom Remodel in Chicago

Jane L

After Remodeling

  • Jane L-Chicago After 1
  • Jane L-Chicago After 2
  • Jane L-Chicago After 3
  • Jane L-Chicago After 4

Before Remodeling

  • Jane L -Chicago before 1
  • Jane L -Chicago before 2
  • Jane L -Chicago before 3

Stately 100 year old condominium on Lake Shore Drive, had a poorly renovated master bathroom. The new owner was interested in “aging in place” and wanted a more accessible bath room. We changed the tub to a custom walk in shower. The toilet was placed on the wrong wall making it very difficult to get to the shower.
The 100 year old construction presented some challenges, but the results made it worth the effort. The toilet is now on the opposite wall leaving a direct path to the new shower.


“Never having had remodeling done previously, I needed a provider where I could get good design help and see choices and options, but not unlimited options. I needed the choices narrowed down. My first goal was quality – do it right the first time. My second goal was a bathroom where I could “age in place”. Marc came to see the empty condo that I purchased in a nearly 100 year old high rise building. He took photos and measurements. He came again on his own to see an in-process remodel in another unit so that he could see behind the walls and under the floor.

The next time I met with Marc and his designer and looked at ideas. The tub would be removed and a shower stall with a glass door and a bench put into its place. Inside the shower, a niche would be installed to hold shampoo and other items. The toilet would be moved to the opposite wall to give clear access to the shower stall with a walker (if and when that should that become necessary). We spent time looking at wall tile, floor tile and cabinets. On my next visit, we made those choices and looked at toilets, sinks, other plumbing fixtures and accessories.

After the contract was signed, we worked with the building’s board of directors to meet their remodeling and insurance requirements. We met with the building’s plumbing company because when the walls were opened, updates to the unit’s plumbing (risers and supply lines) had to be performed. Once everything was approved, I was put into the line. Several months later, the work began. The only interruption that occurred was when the building’s plumbing company did their work. Otherwise, a skilled workman was there all day, every day, to complete the demolition and remodeling. The process took about seven weeks.

The results were beyond expectations. The new bathroom is both beautiful and functional. During the process of remodeling, the bedroom’s hardwood floor was damaged by water. Masters Kitchen and Bath took responsibility for the damage and brought in a company to repair and refinish the bedroom floor.”

 

Jane L

Schedule a Consultation

If you are interested in remodeling your Kitchen, Bathroom or your Basement please click on the button bellow and fill out a “Schedule a Consultation” form. Otherwise you can call us at (847) 823-1700 or visit our showroom at 1014 Busse Hwy, Park Ridge, IL 60068

ASK A QUESTION

Additional Info

  • Project Type: Bathroom Remodeling
  • Project Year: 2017
  • Client Name: Jane L
  • Project Location: Chicago, Illinois

Related Projects

Alaina V Mount Prospect bathroom
, , , ,

Eric T Park Ridge Master Bath

This elegant 1920’s Tudor home lacked a 2020’s master bedroom and bathroom…
, , ,

Becky R Park Ridge Bath

This classic 1920's Georgian was perfect for a growing family with one glaring exception; ONE BATHROOM upstairs. The small dated…
, , ,

Cathy H Park Ridge Master Bath

Elegant Park Ridge home, suffered from a large, oddly configured master bathroom. The long space featured a 1980's whirlpool tub…
, ,

Hillary P Evanston Bath

The owners of this 1920's condo conversion, wanted to keep the vintage feel of the spaces, but enjoy some updated…
, , ,

John G Lincolnwood Bath

20 or 30 years ago a master bathroom was added to the finished basement of this 1950's Georgian home. With…
, ,

Laura H Glenview Hall Bath

Pleased with the progress of the Master Bathroom, our client wanted to update the hall bathroom as well. The bathroom…
, ,

Nicholas H Chicago Bath

Handsome "Turn Of The Century" condo conversion had the typical cramped, dated, barebones bathroom.
, ,

Rhonda R Arlington Hts Bath

We started with very dated 60's bathroom featuring a huge wall mounted medicine cabinet over a cramped double sink vanity.…
, , ,

Shannon W Chicago Bath

This Lakeview loft conversion with a panoramic City view, had one small dated bathroom. The Owner wanted an elevated quality…
, ,

Taiss L Chicago Bath

Upscale Logan Square townhome had an ornate but awkward master bathroom.
, , , ,

Charlotte M Long Grove Master Bath

This gracious country manor house had a large master bathroom with a tiny shower stall and an odd vanity layout.
, , , ,

Lanny B Highland Park Bath

This charming eclectic ranch home had a cramped dated bathroom with no storage.
, , , ,

Laura H Glenview Master Bath

A large gracious suburban home built in the 1990's, was due for an upgrade in the master bathroom. The ample…
, , , ,

Natalie C Long Grove Master Bath

The basement bathroom in this newer home was badly damaged by a broken pipe.
, , , ,

Stephanie M Chicago Master Bath

This newer upscale Lakeview townhome had bathrooms that were anything but upscale. The master bathroom had a tub and shower,…
, ,

Julie A Green Oaks Master Bath

This large upscale home had plenty of amenities, but the master bathroom was definitely NOT one of them. The space…
© Copyright | Masters Kitchen & Bath | Web Design & Development by Data Driven Design
Click to Hide Advanced Floating Content
Schedule a Consultation